Stress State of a Coal Pillar in Fully Mechanized Longwall Mining in Dislocation Zone
- 作者: Seryakov V.M.1, Rib S.V.2, Fryanov V.N.2
-
隶属关系:
- Chinakal Institute of Mining, Siberian Branch
- Siberain State Industrial University
- 期: 卷 53, 编号 6 (2017)
- 页面: 1001-1008
- 栏目: Geomechanics
- URL: https://ogarev-online.ru/1062-7391/article/view/184400
- DOI: https://doi.org/10.1134/S1062739117063065
- ID: 184400
如何引用文章
详细
Stress state of rock mass during fully mechanized longwalling in dislocation zone is analyzed. In focus is the variant of crossing the dislocation zone with disassembling the fully mechanized longwall system and its re-assembling in a new room. Stress redistribution in coal and host rocks when heading approaches dislocation and in post-dislocation mining from the new assembling room is determined.
作者简介
V. Seryakov
Chinakal Institute of Mining, Siberian Branch
编辑信件的主要联系方式.
Email: vser@misd.ru
俄罗斯联邦, Novosibirsk, 630091
S. Rib
Siberain State Industrial University
Email: vser@misd.ru
俄罗斯联邦, Novokuznetsk, 654007
V. Fryanov
Siberain State Industrial University
Email: vser@misd.ru
俄罗斯联邦, Novokuznetsk, 654007
补充文件
