Stress State of a Coal Pillar in Fully Mechanized Longwall Mining in Dislocation Zone
- Authors: Seryakov V.M.1, Rib S.V.2, Fryanov V.N.2
-
Affiliations:
- Chinakal Institute of Mining, Siberian Branch
- Siberain State Industrial University
- Issue: Vol 53, No 6 (2017)
- Pages: 1001-1008
- Section: Geomechanics
- URL: https://ogarev-online.ru/1062-7391/article/view/184400
- DOI: https://doi.org/10.1134/S1062739117063065
- ID: 184400
Cite item
Abstract
Stress state of rock mass during fully mechanized longwalling in dislocation zone is analyzed. In focus is the variant of crossing the dislocation zone with disassembling the fully mechanized longwall system and its re-assembling in a new room. Stress redistribution in coal and host rocks when heading approaches dislocation and in post-dislocation mining from the new assembling room is determined.
About the authors
V. M. Seryakov
Chinakal Institute of Mining, Siberian Branch
Author for correspondence.
Email: vser@misd.ru
Russian Federation, Novosibirsk, 630091
S. V. Rib
Siberain State Industrial University
Email: vser@misd.ru
Russian Federation, Novokuznetsk, 654007
V. N. Fryanov
Siberain State Industrial University
Email: vser@misd.ru
Russian Federation, Novokuznetsk, 654007
Supplementary files
