Stress State of a Coal Pillar in Fully Mechanized Longwall Mining in Dislocation Zone
- Авторлар: Seryakov V.M.1, Rib S.V.2, Fryanov V.N.2
-
Мекемелер:
- Chinakal Institute of Mining, Siberian Branch
- Siberain State Industrial University
- Шығарылым: Том 53, № 6 (2017)
- Беттер: 1001-1008
- Бөлім: Geomechanics
- URL: https://ogarev-online.ru/1062-7391/article/view/184400
- DOI: https://doi.org/10.1134/S1062739117063065
- ID: 184400
Дәйексөз келтіру
Аннотация
Stress state of rock mass during fully mechanized longwalling in dislocation zone is analyzed. In focus is the variant of crossing the dislocation zone with disassembling the fully mechanized longwall system and its re-assembling in a new room. Stress redistribution in coal and host rocks when heading approaches dislocation and in post-dislocation mining from the new assembling room is determined.
Авторлар туралы
V. Seryakov
Chinakal Institute of Mining, Siberian Branch
Хат алмасуға жауапты Автор.
Email: vser@misd.ru
Ресей, Novosibirsk, 630091
S. Rib
Siberain State Industrial University
Email: vser@misd.ru
Ресей, Novokuznetsk, 654007
V. Fryanov
Siberain State Industrial University
Email: vser@misd.ru
Ресей, Novokuznetsk, 654007
Қосымша файлдар
