Erratum to: “Optimal extraction sequence modeling for open pit mining operation considering the dynamic cutoff grade”
- Authors: Moosavi E.1, Gholamnejad J.2
-
Affiliations:
- Department of Mining Engineering, South Tehran Branch
- Department of Mining and Metallurgical Engineering
- Issue: Vol 52, No 6 (2016)
- Pages: 1224-1224
- Section: Erratum
- URL: https://ogarev-online.ru/1062-7391/article/view/184085
- DOI: https://doi.org/10.1134/S1062739116061772
- ID: 184085
Cite item
Abstract
In the published version there is an error in the title. The present form in this erratum is the correct: Optimal Cutoff Grades Modeling for Open Pit Mining Operations during Mining Sequences.
About the authors
E. Moosavi
Department of Mining Engineering, South Tehran Branch
Author for correspondence.
Email: se.moosavi@yahoo.com
Iran, Islamic Republic of, Tehran
J. Gholamnejad
Department of Mining and Metallurgical Engineering
Email: se.moosavi@yahoo.com
Iran, Islamic Republic of, Yazd
Supplementary files
