Erratum to: “Optimal extraction sequence modeling for open pit mining operation considering the dynamic cutoff grade”
- Autores: Moosavi E.1, Gholamnejad J.2
-
Afiliações:
- Department of Mining Engineering, South Tehran Branch
- Department of Mining and Metallurgical Engineering
- Edição: Volume 52, Nº 6 (2016)
- Páginas: 1224-1224
- Seção: Erratum
- URL: https://ogarev-online.ru/1062-7391/article/view/184085
- DOI: https://doi.org/10.1134/S1062739116061772
- ID: 184085
Citar
Resumo
In the published version there is an error in the title. The present form in this erratum is the correct: Optimal Cutoff Grades Modeling for Open Pit Mining Operations during Mining Sequences.
Sobre autores
E. Moosavi
Department of Mining Engineering, South Tehran Branch
Autor responsável pela correspondência
Email: se.moosavi@yahoo.com
Irã, Tehran
J. Gholamnejad
Department of Mining and Metallurgical Engineering
Email: se.moosavi@yahoo.com
Irã, Yazd
Arquivos suplementares
