Erratum to: “Optimal extraction sequence modeling for open pit mining operation considering the dynamic cutoff grade”


Citar

Texto integral

Acesso aberto Acesso aberto
Acesso é fechado Acesso está concedido
Acesso é fechado Somente assinantes

Resumo

In the published version there is an error in the title. The present form in this erratum is the correct: Optimal Cutoff Grades Modeling for Open Pit Mining Operations during Mining Sequences.

Sobre autores

E. Moosavi

Department of Mining Engineering, South Tehran Branch

Autor responsável pela correspondência
Email: se.moosavi@yahoo.com
Irã, Tehran

J. Gholamnejad

Department of Mining and Metallurgical Engineering

Email: se.moosavi@yahoo.com
Irã, Yazd

Arquivos suplementares

Arquivos suplementares
Ação
1. JATS XML

Declaração de direitos autorais © Pleiades Publishing, Ltd., 2016