Planning and Scheduling Works in Concrete Products Plants
- Авторлар: Ryzhikov A.O.1, Firsov A.S.1, Khobotov E.N.1,2
-
Мекемелер:
- Bauman Moscow State Technical University
- Trapeznikov Institute of Control Sciences
- Шығарылым: Том 80, № 8 (2019)
- Беттер: 1552-1560
- Бөлім: Automation in Industry
- URL: https://ogarev-online.ru/0005-1179/article/view/151146
- DOI: https://doi.org/10.1134/S0005117919080137
- ID: 151146
Дәйексөз келтіру
Аннотация
The specificity of concrete products (CP) plants planning and scheduling is discussed. Design concepts of work schedules for such facilities are examined. Operation principles of scheduling algorithms are described.
Негізгі сөздер
Авторлар туралы
A. Ryzhikov
Bauman Moscow State Technical University
Хат алмасуға жауапты Автор.
Email: info@avtprom.ru
Ресей, Moscow
A. Firsov
Bauman Moscow State Technical University
Хат алмасуға жауапты Автор.
Email: info@avtprom.ru
Ресей, Moscow
E. Khobotov
Bauman Moscow State Technical University; Trapeznikov Institute of Control Sciences
Хат алмасуға жауапты Автор.
Email: e_khobotov@mail.ru
Ресей, Moscow; Moscow
Қосымша файлдар
