Evaluation of System Effectiveness for Unloading at Nuclear Power Plants


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

The electrical consumption schedules and the structure of the installed power of the Unified Power System (EES) of Russia are examined. The operating costs of nuclear power plants compared to combined cycle (steam-gas) plants as a function of the depth of nighttime unloading at different times in the fuel campaign of nuclear power plants are calculated. It is shown that running nuclear power plants with variable loading is economically unfavorable compared to unloading of combined cycle plants; in addition, at the end of a campaign, the unloading of a nuclear power plant is limited and requires deeper unloading of the unit all the way to stoppage, which leads to greater system costs.

作者简介

R. Aminov

Saratov Scientific Center, Russian Academy of Sciences

编辑信件的主要联系方式.
Email: oepran@inbox.ru
俄罗斯联邦, Saratov

M. Garievskii

Saratov Scientific Center, Russian Academy of Sciences

Email: oepran@inbox.ru
俄罗斯联邦, Saratov

补充文件

附件文件
动作
1. JATS XML

版权所有 © Springer Science+Business Media, LLC, part of Springer Nature, 2018