Evaluation of System Effectiveness for Unloading at Nuclear Power Plants


Citar

Texto integral

Acesso aberto Acesso aberto
Acesso é fechado Acesso está concedido
Acesso é fechado Somente assinantes

Resumo

The electrical consumption schedules and the structure of the installed power of the Unified Power System (EES) of Russia are examined. The operating costs of nuclear power plants compared to combined cycle (steam-gas) plants as a function of the depth of nighttime unloading at different times in the fuel campaign of nuclear power plants are calculated. It is shown that running nuclear power plants with variable loading is economically unfavorable compared to unloading of combined cycle plants; in addition, at the end of a campaign, the unloading of a nuclear power plant is limited and requires deeper unloading of the unit all the way to stoppage, which leads to greater system costs.

Sobre autores

R. Aminov

Saratov Scientific Center, Russian Academy of Sciences

Autor responsável pela correspondência
Email: oepran@inbox.ru
Rússia, Saratov

M. Garievskii

Saratov Scientific Center, Russian Academy of Sciences

Email: oepran@inbox.ru
Rússia, Saratov

Arquivos suplementares

Arquivos suplementares
Ação
1. JATS XML

Declaração de direitos autorais © Springer Science+Business Media, LLC, part of Springer Nature, 2018