Improving the Construction of Mechanized Complexes for Reloading Points while Developing Deep Open Pits
- Authors: Shustov O.O.1, Haddad J.S.2, Adamchuk A.A.1, Rastsvietaiev V.O.1, Cherniaiev O.V.1
-
Affiliations:
- Dnipro University of Technology
- Al-Balqa Applied University
- Issue: Vol 55, No 6 (2019)
- Pages: 946-953
- Section: Mineral Mining Technology
- URL: https://ogarev-online.ru/1062-7391/article/view/184781
- DOI: https://doi.org/10.1134/S1062739119066332
- ID: 184781
Cite item
Abstract
Layouts of reloading points in the cyclical-and-continuous technology for deep-level surface mining are analyzed. The innovative structure of a reloading point involving dump trucks drivethrough passing has been proposed; the structure will make it possible to increase reloading point productivity, cut the costs for rock mass extraction, and reduce the time of motor transport maneuvering. Dependence of general funds saving for overburden rock extraction upon the open pit depth while constructing a reloading point with the drivethrough passing comparing to a dead-end unloading of various-capacity dump trucks has been determined.
About the authors
O. O. Shustov
Dnipro University of Technology
Email: drjamil@bau.edu.jo
Ukraine, Dnipro
J. S. Haddad
Al-Balqa Applied University
Author for correspondence.
Email: drjamil@bau.edu.jo
Jordan, Amman
A. A. Adamchuk
Dnipro University of Technology
Email: drjamil@bau.edu.jo
Ukraine, Dnipro
V. O. Rastsvietaiev
Dnipro University of Technology
Email: drjamil@bau.edu.jo
Ukraine, Dnipro
O. V. Cherniaiev
Dnipro University of Technology
Email: drjamil@bau.edu.jo
Ukraine, Dnipro
Supplementary files
