Introduction of pulverized-coal injection at Yenakiieve Iron and Steel Works
- Autores: Podkorytov A.L.1, Kuznetsov A.M.1, Zubenko A.V.1, Semenov Y.S.2,3, Nesterov A.S.2, Shumelchik E.I.2,3
-
Afiliações:
- Yenakiieve Iron and Steel Works
- Iron and Steel Institute
- Scientific Technical Company ISD
- Edição: Volume 47, Nº 5 (2017)
- Páginas: 313-319
- Seção: Article
- URL: https://ogarev-online.ru/0967-0912/article/view/179580
- DOI: https://doi.org/10.3103/S0967091217050102
- ID: 179580
Citar
Resumo
The introduction of pulverized-coal injection at Yenakiieve Iron and Steel Works in 2016 is described. The state of the lining of the blast-furnace shaft and hearth is analyzed. Requirements regarding the charging conditions are proposed so as to improve the durability of the cooling system and ensure accident- free furnace operation.
Palavras-chave
Sobre autores
A. Podkorytov
Yenakiieve Iron and Steel Works
Email: yuriy.semenov.isi@gmail.com
Ucrânia, Yenakiieve
A. Kuznetsov
Yenakiieve Iron and Steel Works
Email: yuriy.semenov.isi@gmail.com
Ucrânia, Yenakiieve
A. Zubenko
Yenakiieve Iron and Steel Works
Email: yuriy.semenov.isi@gmail.com
Ucrânia, Yenakiieve
Yu. Semenov
Iron and Steel Institute; Scientific Technical Company ISD
Autor responsável pela correspondência
Email: yuriy.semenov.isi@gmail.com
Ucrânia, Dnipro; Dnipro
A. Nesterov
Iron and Steel Institute
Email: yuriy.semenov.isi@gmail.com
Ucrânia, Dnipro
E. Shumelchik
Iron and Steel Institute; Scientific Technical Company ISD
Email: yuriy.semenov.isi@gmail.com
Ucrânia, Dnipro; Dnipro
Arquivos suplementares