Genetic algorithm for the resource-constrained project scheduling problem


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

We consider the resource-constrained project scheduling problem with respect to the makespan minimization criterion. The problem accounts for technological constraints of activities precedence together with resource constraints. We propose a genetic algorithm with two versions of crossovers based on the idea of most rational use of constrained resources. The crossovers uses a heuristic that takes into account the degree of criticality for the resources, which is derived from the solution of a relaxed problem with a constraint on accumulative resources. A numerical experiment with examples from the PCPLIB library has shown that the proposed algorithm has competitive quality. For some examples from the j120 test series the best known solutions were improved and for j60 (50 000 and 500 000 iterations) and for j120 (500 000 iterations) we have obtain the best average deviations of the solutions from the critical path value.

作者简介

E. Goncharov

Novosibirsk State University; Sobolev Institute of Mathematics, Siberian Branch

编辑信件的主要联系方式.
Email: gon@math.nsc.ru
俄罗斯联邦, Novosibirsk; Novosibirsk

V. Leonov

Sobolev Institute of Mathematics, Siberian Branch

Email: gon@math.nsc.ru
俄罗斯联邦, Novosibirsk

补充文件

附件文件
动作
1. JATS XML

版权所有 © Pleiades Publishing, Ltd., 2017