Technical and Economical Feasibility of Putting the Steam Turbine of PGU-450 into Motoring Mode
- 作者: Arakelyan É.K.1, Andryushin A.V.1, Burtsev S.Y.1, Andryushin K.A.1
-
隶属关系:
- National Research Uninersity “Moscow Power Engineering Institute”
- 期: 卷 51, 编号 4 (2017)
- 页面: 451-453
- 栏目: Article
- URL: https://ogarev-online.ru/1570-145X/article/view/245881
- DOI: https://doi.org/10.1007/s10749-017-0854-4
- ID: 245881
如何引用文章
详细
Technical and economical feasibility of using the motoring mode of the steam turbine of PGU-450 CCPP to reserve its capacity as an alternative to turbine shutdown is analyzed. It is shown that putting the steam turbine to motoring mode and shutting down the gas turbines and heat-recovery steam generators to reserve the capacity of PGU-450 for 7 – 8 h is more economic than shutting down the steam turbine. In this case, the duration of the start-ups of PGU-450 is 35 – 40 min rather than 80 – 90 min.
作者简介
É. Arakelyan
National Research Uninersity “Moscow Power Engineering Institute”
编辑信件的主要联系方式.
Email: Edik_arakelyan@inbox.ru
俄罗斯联邦, Moscow
A. Andryushin
National Research Uninersity “Moscow Power Engineering Institute”
Email: Edik_arakelyan@inbox.ru
俄罗斯联邦, Moscow
S. Burtsev
National Research Uninersity “Moscow Power Engineering Institute”
Email: Edik_arakelyan@inbox.ru
俄罗斯联邦, Moscow
K. Andryushin
National Research Uninersity “Moscow Power Engineering Institute”
Email: Edik_arakelyan@inbox.ru
俄罗斯联邦, Moscow
补充文件