Technical and Economical Feasibility of Putting the Steam Turbine of PGU-450 into Motoring Mode


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

Technical and economical feasibility of using the motoring mode of the steam turbine of PGU-450 CCPP to reserve its capacity as an alternative to turbine shutdown is analyzed. It is shown that putting the steam turbine to motoring mode and shutting down the gas turbines and heat-recovery steam generators to reserve the capacity of PGU-450 for 7 – 8 h is more economic than shutting down the steam turbine. In this case, the duration of the start-ups of PGU-450 is 35 – 40 min rather than 80 – 90 min.

作者简介

É. Arakelyan

National Research Uninersity “Moscow Power Engineering Institute”

编辑信件的主要联系方式.
Email: Edik_arakelyan@inbox.ru
俄罗斯联邦, Moscow

A. Andryushin

National Research Uninersity “Moscow Power Engineering Institute”

Email: Edik_arakelyan@inbox.ru
俄罗斯联邦, Moscow

S. Burtsev

National Research Uninersity “Moscow Power Engineering Institute”

Email: Edik_arakelyan@inbox.ru
俄罗斯联邦, Moscow

K. Andryushin

National Research Uninersity “Moscow Power Engineering Institute”

Email: Edik_arakelyan@inbox.ru
俄罗斯联邦, Moscow

补充文件

附件文件
动作
1. JATS XML

版权所有 © Springer Science+Business Media, LLC, 2017