Improving the Investment Potential of the Evenkiiskaya HPP When Working Jointly with HPPS of the Volga – Kama Cascade
- Авторы: Aleksandrovskii A.Y.1, Soldatkin A.Y.1, Volkov D.M.1
-
Учреждения:
- National Research University “MPÉI”
- Выпуск: Том 50, № 3 (2016)
- Страницы: 235-239
- Раздел: Hydrotechnical Construction
- URL: https://ogarev-online.ru/1570-145X/article/view/245184
- DOI: https://doi.org/10.1007/s10749-016-0689-4
- ID: 245184
Цитировать
Аннотация
The capability is studied of improving the investment potential of the Evenkiiskaya HPP by using the power it generates in the United Power System of the European part of Russia by transitioning to a compensated electrical regime of water reservoir resource usage. A quantitative assessment of Evenkiiskaya HPP usage is presented using daily load demand. Increasing the guaranteed HPP power is proposed as an alternative to new nuclear power stations.
Об авторах
A. Aleksandrovskii
National Research University “MPÉI”
Автор, ответственный за переписку.
Email: ayaleksand@mail.ru
Россия, Moscow
A. Soldatkin
National Research University “MPÉI”
Email: ayaleksand@mail.ru
Россия, Moscow
D. Volkov
National Research University “MPÉI”
Email: ayaleksand@mail.ru
Россия, Moscow
Дополнительные файлы
