Economic Expediency of Copper Ore Mining with Waste Rock Fill of Secondary Stopes in the West Wing of the Oktyabrsky Deposit


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

The economic expediency of developing the west wing reserves of Oktyabrsky Mine by cutand-fill method with cemented backfill of primary stopes and waste rock fill of secondary stopes has been determined. This method shows better performance in terms of ore loss and dilution as compared with the current mining system at the same quality of ore produced. Feasibility study of two variants of process design in the full cycle of mining, processing and recovery of primary metal (nickel) and associated metals (copper, platinum, etc.) shows that the proposed mining system allows higher profit per unit of ore mining and processing.

作者简介

V. Uskov

Chinakal Institute of Mining, Siberian Branch

编辑信件的主要联系方式.
Email: wau347743@list.ru
俄罗斯联邦, Novosibirsk, 630091

S. Kondrat’ev

Chinakal Institute of Mining, Siberian Branch

Email: wau347743@list.ru
俄罗斯联邦, Novosibirsk, 630091

S. Neverov

Chinakal Institute of Mining, Siberian Branch

Email: wau347743@list.ru
俄罗斯联邦, Novosibirsk, 630091

补充文件

附件文件
动作
1. JATS XML

版权所有 © Pleiades Publishing, Ltd., 2017