Method of Shaping Loading-and-Transportation System in Deep Open Pit Complex Ore Mines


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

The article presents a procedure to select loading and transportation machines for an open pit complex ore mine. The choice of a shovel–dump truck production system is validated using a statistical testing method (Monte Carlo technique). Stop-watch readings allowed relating the productivity of the production system, degree of ore fragmentation and content of oversizes; the soundness of the choice of the production system based on the revealed criterion was proved. Using the law of the Palm flows, the authors determine the number and sequence of dump trucks for loading in a one-server system.

作者简介

T. Kumykova

Serikbaev East Kazakhstan State Technical University

编辑信件的主要联系方式.
Email: ktm6010@mail.ru
哈萨克斯坦, ul. A. K. Protozanova 69, Ust-Kamenogorsk, 070004 Republic of

V. Kumykov

Serikbaev East Kazakhstan State Technical University

Email: ktm6010@mail.ru
哈萨克斯坦, ul. A. K. Protozanova 69, Ust-Kamenogorsk, 070004 Republic of

补充文件

附件文件
动作
1. JATS XML

版权所有 © Pleiades Publishing, Ltd., 2017