Finding Forces Required to Change Air Hammer Path in Soil


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

The authors solve the problem on forces required to change drilling path of air hammers in soil. Soil mass is assumed a rigid–plastic medium with the Mohr–Coulomb yield, and the air hammer deviator is considered as a nondeformable body. The problem is solved in two stages: introduction of the deviator in soil and travel of the air hammer in soil with the rear deviated at a certain angle. The loads applied to the rear, the forces and the moment required to changing the path of an air hammer in soil are calculated.

作者简介

B. Danilov

Chinakal Institute of Mining, Siberian Branch

Email: bsmol@misd.ru
俄罗斯联邦, Krasnyi pr. 54, Novosibirsk, 630091

B. Smolyanitsky

Chinakal Institute of Mining, Siberian Branch; Siberian State Transport University

编辑信件的主要联系方式.
Email: bsmol@misd.ru
俄罗斯联邦, Krasnyi pr. 54, Novosibirsk, 630091; ul. D. Kovalchuk 191, Novosibirsk, 630049

A. Chanyshev

Chinakal Institute of Mining, Siberian Branch; Novosibirsk State University of Economics and Management

Email: bsmol@misd.ru
俄罗斯联邦, Krasnyi pr. 54, Novosibirsk, 630091; ul. Kamenskaya 56, Novosibirsk, 630099

D. Cheshchin

Chinakal Institute of Mining, Siberian Branch

Email: bsmol@misd.ru
俄罗斯联邦, Krasnyi pr. 54, Novosibirsk, 630091

补充文件

附件文件
动作
1. JATS XML

版权所有 © Pleiades Publishing, Ltd., 2017