Shuttle and Bench Flow Charts in Underground Mining of Thick Methane-Bearing Coal Seams
- Авторлар: Ordin A.A.1,2, Timoshenko A.M.3, Bovenko D.V.3, Meshkov A.A.4, Volkov M.A.4
-
Мекемелер:
- Chinakal Institute of Mining, Siberian Branch
- VostNII Research and Production Center
- VostNII Science Center
- SUEK-Kizbass
- Шығарылым: Том 55, № 2 (2019)
- Беттер: 264-272
- Бөлім: Mineral Mining Technology
- URL: https://ogarev-online.ru/1062-7391/article/view/184670
- DOI: https://doi.org/10.1134/S1062739119025540
- ID: 184670
Дәйексөз келтіру
Аннотация
The studies aimed to evaluate longwall productivity in the Talda-Zapadnaya 1 Mine are carried out with regard to the technological parameters of the drum shearer and capacity of the armored face conveyor in mining thick methane-bearing coal seam. It is found that methane release reduces with increasing output of the shearer, and allowable longwall length and capacity by the gas criterion are determined. The length of longwall 6605 is optimized by the maximum annual profit of the mine.
Авторлар туралы
A. Ordin
Chinakal Institute of Mining, Siberian Branch; VostNII Research and Production Center
Хат алмасуға жауапты Автор.
Email: ordin@misd.ru
Ресей, Novosibirsk, 630091; Kemerovo, 650002
A. Timoshenko
VostNII Science Center
Email: ordin@misd.ru
Ресей, Kemerovo, 650002
D. Bovenko
VostNII Science Center
Email: ordin@misd.ru
Ресей, Kemerovo, 650002
A. Meshkov
SUEK-Kizbass
Email: ordin@misd.ru
Ресей, Leninsk-Kuznetsky, 652507
M. Volkov
SUEK-Kizbass
Email: ordin@misd.ru
Ресей, Leninsk-Kuznetsky, 652507
Қосымша файлдар
