Determination of open pit diamond mine limits with regard to stripping time difference
- Authors: Yakovlev V.L.1, Zyryanov I.V.2, Akishev A.N.2, Sakantsev G.G.1
-
Affiliations:
- Institute of Mining, Ural Branch
- Yakutniproalmaz Institute
- Issue: Vol 52, No 6 (2016)
- Pages: 1143-1149
- Section: Mineral Mining Technology
- URL: https://ogarev-online.ru/1062-7391/article/view/184047
- DOI: https://doi.org/10.1134/S1062739116061674
- ID: 184047
Cite item
Abstract
The analysis of methods to account for stripping time difference at the stage of determination of limits in deep open pit mining reveals advantages and shortcomings of the methods and provides a principled approach to determination of a discount ultimate strip ratio for the most representative geological and geotechnical conditions of diamond-bearing ore bodies in the form of single pipes. Discounting of marginal strip ratios is based on adding the common formula with an average mean discount coefficient represented by a correlation of mining rate decrease, stripping zone height and highwall slope angle. It is shown that target variation of the factors included in the discount marginal strip ratio allows considerable influence on depth and efficiency of open pit mining.
About the authors
V. L. Yakovlev
Institute of Mining, Ural Branch
Author for correspondence.
Email: yakovlev@igduran.ru
Russian Federation, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620075
I. V. Zyryanov
Yakutniproalmaz Institute
Email: yakovlev@igduran.ru
Russian Federation, ul. Lenina 39, Mirny, Republic of Sakha (Yakutia), 678174
A. N. Akishev
Yakutniproalmaz Institute
Email: yakovlev@igduran.ru
Russian Federation, ul. Lenina 39, Mirny, Republic of Sakha (Yakutia), 678174
G. G. Sakantsev
Institute of Mining, Ural Branch
Email: yakovlev@igduran.ru
Russian Federation, ul. Mamina-Sibiryaka 58, Ekaterinburg, 620075
Supplementary files
