Using a multifuel gas generator in blast-furnace shops


Дәйексөз келтіру

Толық мәтін

Ашық рұқсат Ашық рұқсат
Рұқсат жабық Рұқсат берілді
Рұқсат жабық Тек жазылушылар үшін

Аннотация

The use of pulverized coal in Russian blast furnaces is analyzed. It is shown that the rates of pulverized- coal injection are considerably less than for the world’s best furnaces. The factors hindering such developments in Russia are presented. Measures intended to reduce carbon-dioxide emissions in hot-metal production (the ULCOS program) are analyzed. The introduction of multifuel gas generators of bubbling type in blast-furnace shops is proposed. The hot reducing gases produced in this system will then be injected in the blast furnaces. The operational parameters of a 1033-m3 blast furnace with the injection of hot reducing gases at rates up to 400 m3/t of hot metal are calculated. The injection of hot reducing gases at a rate of 400 m3/t would save coke at a rate of 100–120 kg/t of hot metal. With gas injection at a rate of 700 m3/t, the expected coke savings are as much as 200 kg/t of hot metal. The creation of a consortium of leading steelmakers to develop this technology to the point of industrial trials is recommended.

Авторлар туралы

G. Podgorodetskii

Moscow Institute of Steel and Alloys

Хат алмасуға жауапты Автор.
Email: podgs@misis.ru
Ресей, Moscow

A. Tretyak

OAO Chermetinformatsiya

Email: podgs@misis.ru
Ресей, Moscow

V. Gorbunov

Moscow Institute of Steel and Alloys

Email: podgs@misis.ru
Ресей, Moscow

L. Polulyakh

Moscow Institute of Steel and Alloys

Email: podgs@misis.ru
Ресей, Moscow

Қосымша файлдар

Қосымша файлдар
Әрекет
1. JATS XML

© Allerton Press, Inc., 2016