Multiturn fast extraction of the proton beam from the U-70 synchrotron


Citar

Texto integral

Acesso aberto Acesso aberto
Acesso é fechado Acesso está concedido
Acesso é fechado Somente assinantes

Resumo

A novel system for high-energy beam extraction from the U-70 proton synchrotron to the external beam transfer line (i.e., a multiturn fast extraction system) is described. The beam is forced into the first upstream ejection device—an electrostatic deflector—by means of fast dipole bump magnets with the field rise time of 50–100 μs (equivalent of 10–20 beam turns). The fast bump magnets and their power supplies are described. The first experimental results acquired during trial operation of the multiturn fast extraction system in 2014 are presented. From these results, it is apparent that the extracted beam parameters are close to those obtained with the available single-turn fast extraction system.

Sobre autores

V. Rudko

Institute for High Energy Physics

Autor responsável pela correspondência
Email: Victor.Rudko@ihep.ru
Rússia, pl. Nauki 1, Protvino, Moscow oblast, 142281

S. Avramenko

Institute for High Energy Physics

Email: Victor.Rudko@ihep.ru
Rússia, pl. Nauki 1, Protvino, Moscow oblast, 142281

A. Loguinov

Institute for High Energy Physics

Email: Victor.Rudko@ihep.ru
Rússia, pl. Nauki 1, Protvino, Moscow oblast, 142281

A. Maximov

Institute for High Energy Physics

Email: Victor.Rudko@ihep.ru
Rússia, pl. Nauki 1, Protvino, Moscow oblast, 142281

M. Ovsienko

Institute for High Energy Physics

Email: Victor.Rudko@ihep.ru
Rússia, pl. Nauki 1, Protvino, Moscow oblast, 142281

V. Raev

Institute for High Energy Physics

Email: Victor.Rudko@ihep.ru
Rússia, pl. Nauki 1, Protvino, Moscow oblast, 142281

Yu. Fedotov

Institute for High Energy Physics

Email: Victor.Rudko@ihep.ru
Rússia, pl. Nauki 1, Protvino, Moscow oblast, 142281

Arquivos suplementares

Arquivos suplementares
Ação
1. JATS XML

Declaração de direitos autorais © Pleiades Publishing, Inc., 2016